Shoreline Construction

Shoreline Restoration & Erosion Repair

Permits, design, and construction — armour stone and rip-rap shorelines built to stand up to wave, wake, and ice. Handled start to finish, any time of year.

Newly constructed armour stone and rip-rap shoreline along a Kawartha lake

From permits to finished shoreline

Shoreline work is one of the most regulated jobs you can take on at the cottage — and one of the most important. We handle the entire process: permits with the waterway, approvals with the conservation authority, construction, and final cleanup. You sign one contract, we take care of the rest.

Whether you're protecting an eroding bank, rebuilding after ice damage, or upgrading to a clean armour stone wall, we build shorelines that stand up to wind, waves, and decades of seasons.

  • Free on-site consultation
  • Waterway and conservation authority permitting
  • Erosion control and silt curtains during construction
  • Armour stone walls or rip-rap revetments
  • Geotextile, base prep, and proper drainage
  • Cleanup and final grading after completion
What We Handle

The whole project, start to finish

Permits Handled

We manage the paperwork with the waterway and conservation authorities so you don't have to.

Armour Stone & Rip-Rap

Custom-built shorelines that stop erosion, withstand ice and waves, and look like they belong.

Year-Round Installs

We work right through winter — your shoreline is finished and ready to enjoy when summer arrives.

Built to Code

Proper geotextile, drainage, and stone sizing — engineered to meet authority requirements and last.

Know The Signs

Signs your shoreline needs work

Shorelines rarely fail all at once. If you're seeing any of these, the bank is already moving — and it's far cheaper to fix now than after a section lets go.

Undercut bank

The sod hangs out over open air at the waterline — the soil beneath it has already washed away.

Slumping or cracking edge

Sections of lawn are dropping toward the water, often with a crack running parallel to the shore.

Beach sand disappearing

Sand you paid for keeps migrating out into the lake because there's nothing holding the toe.

Exposed tree roots

Shoreline trees are losing the ground around them — the next windstorm takes them and the bank with them.

Ice-shoved stone

Spring ice pushed your existing stone out of line, leaving gaps that let the bank behind it wash out.

Muddy water after rain

Surface water is running over the edge instead of being drained away, taking soil into the lake with it.

Options

Shorelines we build

The right shoreline depends on your exposure, your bank, and what the approval allows. Here's how we usually match them up.

Armour stone steps built down to the water between shoreline stone walls

Armour stone wall

Best when you want a clean, defined edge on a sheltered bay or a bank that needs holding back.

Rip-rap revetment

Best on exposed, high-energy shorelines — the sloped stone absorbs wave and ice energy instead of reflecting it.

Natural / vegetated shoreline

Best where authorities want a soft, planted edge — root systems and stone toe protection working together.

Beach & sand areas

Best for families who want a usable swimming entry, built with a proper retained toe so the sand stays put.

Boat launch & ramps

Best for properties that launch off their own frontage and need a stable, gradual, load-bearing surface.

Stone steps to the water

Best on steep frontage — solid, non-slip natural stone treads instead of a temporary wooden staircase.

Looking specifically at walls, steps, and entrance features? See our armour stone page, or read the shoreline restoration guide.

Fraser's Liebherr 920 excavator working on a lakeside shoreline build
How It Works

How a shoreline project runs

01

Free site visit

We walk the frontage with you, look at exposure, access, and what's failing, and talk through the options.

02

Design & quote

You get a plan and a firm price — stone type, dimensions, drainage, and restoration all spelled out.

03

Permit applications

We prepare and submit to the conservation authority and any other agency the job requires.

04

Scheduling

We book the build around your permit approval, the in-water work window, and conditions on the lake.

05

Construction

Silt control goes in first, then base prep, geotextile, drainage, and stone placed by experienced operators.

06

Restoration & cleanup

Final grading, topsoil and sod or seed where needed, and the site left clean.

Winter Builds

Build in winter — enjoy it all summer

Most contractors pack up when the lakes freeze. We don't. Winter is actually one of the best times to build a shoreline — frozen ground means cleaner site access, less disturbance, and your project is finished and ready before the dock goes back in.

Spring, summer, fall, or mid-January — we'll plan the build around your timeline, the permit window, and the conditions on the lake.

  • Own excavators, floats, and dump trucks — no waiting on subcontractors
  • Permits prepared in-house, start to finish
  • Crews working year-round, including winter builds
  • Family-run and locally based since 2010
Winter shoreline construction with Fraser's excavator accessing the site across the frozen lake
Where We Work

Shoreline construction across cottage country

We build shorelines on lakes and rivers throughout central Ontario, including waterfront properties that need careful access.

Shoreline builds often need stone, sand, and topsoil hauled in — see our trucking and topsoil & sod services.

FAQ

Shoreline questions we get asked

Protect your shoreline. Enjoy your waterfront.

One call, one contractor — permits through to finished shoreline. Serving Kawartha Lakes, Haliburton, Muskoka, Durham, Simcoe, and Peterborough.